Projects
Modify Strategy — shift or retime existing blocks
Loads existing charge/discharge strategies for the selected date & projects, and lets you shift or retype their start/end times. This uses PUT (modify) — unlike Bulk Replace, it never deletes a strategy, and any run here can be undone.
Projects
Bulk Replace — multiple sites & dates
Per-site power (kW) and SOC limits are taken from the server config (POWER_MAP). In "Delete + Insert" mode you can define several site groups, each with its own charge/discharge block schedule, and run them all together.
Sites
Available projects
Click to select the projects you want to give a schedule to, then create a group from them. Anything left here stays untouched — it won't be part of this run.
Groups
ENTSO-E Transparency Platform · EUR/MWh · hourly
Hourly Charge / Discharge Report
Pulls hourly charge/discharge (kW) per site for the selected date range. One row per hour, two columns per site.
Sites
Only projects with a non-zero fault/alarm flag, or project status "Fault", are shown here.
Activity Log
Every login, logout, and control action (strategy changes, bulk jobs, deletes) taken by any account. Timestamps are CET/CEST (Europe/Skopje).